Current Planning Application Details
(AM-2024-011)
An Official Plan and zoning by-law amendment application has been submitted to permit the development of two buildings-- one 13 storey apartment building and one 15 storey apartment building with a total of 412 apartment dwelling units. The attached shows details of the proposed development.
The City's Official Plan designates the land as Residential, in part, and Environmental Protection Area, in part. It is designated as Mixed Use, in part, and Environmental Protection Area, in part, under the Garner South Secondary Plan. A maximum height of 6 storeys and maximum density of 75 units per hectare are permitted. The application requests a Special Policy Area designation to redesignate the lands to Residential, High Density (which permits a maximum height of 8 storeys and a maximum density of 125 units per hectare), in part, and amend the portion of lands designated Environmental Protection Area, in part; to allow the residential portion of the land to be developed with apartment buildings with a maximum height of 15 storeys and a maximum density of 319 units per hectare.
The land is zoned Light Industrial (LI) under By-law 79-200, as amended. The applicant is requesting to place the lands under the Residential Apartment 5F Density (R5F) Zone with reduced minimum lot area, minimum rear yard and minimum interior side yard setbacks, parking requirements, and landscaped open space; increased maximum lot coverage and maximum height; and, to permit two apartment dwellings on one lot.
Meeting Date
Tuesday, April 8, 2025
Application Types
- Official Plan Amendment (OPA)
- Zoning By-law Amendment (ZBA)
Associated Files
The application files have been submitted by developers and builders and may not conform to accessibility standards. Should you need assistance with these files, please contact Planning, Building and Development.
- Arborist Report
- Architectural - Perspective Renderings
- Colour Site Plan
- Functional Servicing Design Brief
- Functional Servicing, Storm, Sanitary and Water
- Landscape Architect
- Landscape Drawing
- Noise Feasibility Study
- Open House Notice - November 4 2024
- Phase 1 Environmental Site Assessment
- Phase 2 Environmental Site Assessment
- Phase One ESA
- Planning Justification Addendum No 1
- Planning Justification Report
- Plans, Elevations & Sections
- Public Meeting Notice - April 8, 2025
- RWDI Letter Addendum
- Shadow Studies
- Shadow Study
- Site Plan
- Sun & Shadow Study Report
- Survey - Reference Plan
- Survey - Topography
- Third Party Infrastructure Modeling
- Traffic Mobility Terms of Reference
- Traffic Study
- Urban & Architectural Design Brief
- Wind Study
Contact Us
City of Niagara Falls
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
Canada
905-356-7521
[email protected]